FAN Rui-xiang1, SUN Min1, ZHAO Gang2. Field Debugging of Relocatable Static Var Compensator in Jiangxi Province[J]. High voltageapparatus, 2009, 45(4): 155-158.
FAN Rui-xiang1, SUN Min1, ZHAO Gang2. Field Debugging of Relocatable Static Var Compensator in Jiangxi Province[J]. High voltageapparatus, 2009, 45(4): 155-158.DOI:
According to the project experience of the first relocatable static var compensator application in Jiangxi China
a series of testing methods have been described.Field debugging test result data have been presented in detailed for subsystem testing and system commissioning.Some key principles and attentions are also drawn from it.The conclusions obtained in this paper will be benefit for the application of SVC in China power grid.