LI Yun-ge1, SHI Wei2, ZHANG Xiang-quan1, et al. Analysis of On-site Partial-discharge Test on 750 kV Transformers[J]. High voltageapparatus, 2007, (6): 434-437.
LI Yun-ge1, SHI Wei2, ZHANG Xiang-quan1, et al. Analysis of On-site Partial-discharge Test on 750 kV Transformers[J]. High voltageapparatus, 2007, (6): 434-437.DOI:
This paper analyzes the problems concerning procedure
standards
and process in the on-site acceptance partial-discharge(PD) test on the 750 kV transformers.Some suggestions are therefore offered as follows:①increase the power frequency withstand test voltage for 750 kV transformers;②avoid to perform PD test repeatedly;③ take practical measures if PD quantity exceeds the criterion stated in standard;④redefine the PD inception voltage and extinction voltage;⑤use reliable on-line monitoring apparatus when necessary.These suggestions can also serve as a reference for the same test on 1 000 kV transformer.