shall be adopted first in northwest.Some technical considerations are given to solve the problems appeared in design.Besides
according to technical design and preliminary research results
the three single-phase transformers
with a three-column core and a voltage-regulation scope of 800/-3×2.5% kV
are chosen.As the pre-inserting resistance is used in CB and DS
the very fast transient overvoltage produced in GIS will make little influence to the transformer insulation.With the overvoltage level of 800 kV rated voltages in China