[1]尚金城.舟山HVDC系统的现场调试[J].高压电器,1989(02):26-32.
Shang Jincheng. The on Site Test of ZhouShan HVDC Project[J]. High voltageapparatus, 1989, (2): 26-32.
[1]尚金城.舟山HVDC系统的现场调试[J].高压电器,1989(02):26-32. DOI:
Shang Jincheng. The on Site Test of ZhouShan HVDC Project[J]. High voltageapparatus, 1989, (2): 26-32. DOI:
介绍了我国第一个直流输电工程现场调试情况。讨论了系统起动时投入旁路对(BPP)产生的反极性高电压和由此引起的误触发而造成起动失败的原因。
The on site test of the first HVDC project in China is introduced.The opposite polarity overvoltage caused by BPP when the system starts up and the subsequent mistriggers as well as the causes of resulting start failure are discussed