您当前的位置:
首页 >
文章列表页 >
The Test Study on Abnormal Fusing of the Primary Fuse for 35 kV Capacitor Voltage Transformer
更新时间:2025-04-26
    • The Test Study on Abnormal Fusing of the Primary Fuse for 35 kV Capacitor Voltage Transformer

    • High VoltageApparatus   Vol. 45, Issue 6, Pages: 102-105(2009)
    • CLC: TM451.2
    • Published:2009

    移动端阅览

  • WU Xu-tao1, AI Shao-gui2, LI Xiao-yan3, et al. The Test Study on Abnormal Fusing of the Primary Fuse for 35 kV Capacitor Voltage Transformer[J]. High voltageapparatus, 2009, 45(6): 102-105. DOI:

  •  
  •  

0

Views

351

下载量

28

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Error Characteristics and Application Analysis of CVT with Capacitor C3
STUDY ON ERROR CHARACTERISTIC OF CAPACITOR VOLTAGE TRANSFORMER
EFFECT OF CVT ADDITIONAL PHASE ERROR ON INSULATION MONITORING ON SITE
Analysis of Oil Tank Heating Defect of 110kV Capacitor Voltage Transformer
Investigate on On-line Calibrating Method for CVT by Using a New LVQB Type Current Transformer

Related Author

YANG Liu
GU Fengbiao
FENG Yu
WANG Ling
WANG Jimei
WANG Dezhong
WANG Hong-bin
LI Runhong

Related Institution

China Electric Power Research Institute
Guilin Power Capacitor Co., Ltd.
State Grid Corporation of China
Xi’an Jiaotong University
Guangdong Electric Power Test and Research Institute
0