您当前的位置:
首页 >
文章列表页 >
Investigate to Bushing Failure on Medium Voltage Side of a 500 kV Transformer
更新时间:2025-04-26
    • Investigate to Bushing Failure on Medium Voltage Side of a 500 kV Transformer

    • High VoltageApparatus   Vol. 44, Issue 6, Pages: 584-586(2008)
    • CLC: TM216.5
    • Published:2008

    移动端阅览

  • ZHANG Jian-xing1, ZHANG Jin-xiang1, WANG Jian-wei1, et al. Investigate to Bushing Failure on Medium Voltage Side of a 500 kV Transformer[J]. High voltageapparatus, 2008, 44(6): 584-586. DOI:

  •  
  •  

0

Views

123

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Accident Analysis of Transformer Installation
Studies on Online Monitoring and Onsite Dielectric Loss Measurement of 500 kV Transformer Bushing
Analysis of Cable Sheath Overvoltage Due to Main Transformer No-load Closing
Prediction Model for Dissolved Gas in Transformer Oil Based on Policy Gradient Optimization
Research on Hybrid Finite Element Method Based on Triangle Mesh and Its Application in Fluid-heat Coupled Calculation of Transformer

Related Author

LIANG Fang-jian
LIU Xun
YANG Yan-qi
DONG Yuxi
XIE Deying
ZENG Li
XIE Bingping
ZHANG Caijun

Related Institution

Shangqiu Power Supply Company
Huizhou Electric Power Supply Bureau of Guangdong Power Grid Company Limited
Huiyang Ho Using and Urban and Rural Planning and Construction Bureau of Huizhou City
Hubei Bailianhe Pumped Storage Co.,Ltd.
School of Electrical Engineering, Wuhan University
0