您当前的位置:
首页 >
文章列表页 >
Analysis of On-site Partial-discharge Test on 750 kV Transformers
更新时间:2025-04-26
    • Analysis of On-site Partial-discharge Test on 750 kV Transformers

    • High VoltageApparatus   Issue 6, Pages: 434-437(2007)
    • CLC: TM855
    • Published:2007

    移动端阅览

  • LI Yun-ge1, SHI Wei2, ZHANG Xiang-quan1, et al. Analysis of On-site Partial-discharge Test on 750 kV Transformers[J]. High voltageapparatus, 2007, (6): 434-437. DOI:

  •  
  •  

0

Views

248

下载量

18

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test
Research on Oil Tank Seam Type Detection Method for Partial Discharge of Transformer
THE PROGRAM DEVELOPMENT OF PD LOCATION SYSTEM USED IN LARGE-SIZE TRANSFORMER
Elimination of "Large Pulse" Existing during Partial Discharge Test for Transformer
Comprehensive Judgement Analysis about Partial Discharge in Transformer

Related Author

L Jing-shun1
ZHANG Hong-liang2
WANG Xuan2
HAO Xiao-hong2
FAN Di-ming1
ZENG Xingyi
ZHAO Yan
ZHENG Shusheng

Related Institution

Gansu Electric Power Research Institute
College of Electrical Engineering and Information Engineering,Lanzhou University of Technology
甘肃电力科学研究院兰州理工大学电气工程与信息工程学院
State Grid Fujian Wuyishan Power Supply Co., Ltd.
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
0