The major problem of live working on 500 kV compact line is to determine the minimum approach distance.To solve the problem
this paper analyzed GB/T 19185-2003 "The Computational Method on the Approach Distance of AC Circuit Living Work"
judged the reliability of live working with dangerous rate of real live working through calculation and experiment based on a real case.According to the requirement that dangerous rate should be less than 1×10-5
the approach distance can be calculated
hence the minimum phase-ground distance and phase spacing of the linear tower of 500 kV compact line are respectively achieved as 2.6 m and 4.5 m
and the minimum phase-ground distance and phase spacing of the angle tower and terminal tower as respective 2.7 m and 4.5 m.Finally the security and feasibility of live working was checked based on the real size of the line tower.The research illustrates that live working is safe and feasible on this line.
Research on Human Digital Twins for Live Working on Transmission Lines Based on Attitude Estimation
Study on the Amplitude and Energy Characteristics of the in and out of Equipotential Pulse Current for 1000 kV Transmission Line Tension Tower Based on HHT
Live Working Insulation Blanket Surface Defect Recognition Based on Improved YOLOv8
Compact Prefabricated Substation and Its Improvement Using Intelligent Control Technology
Insulation Protection Design of Live working Robot for 10 kV Distribution Power Systems
Related Author
ZHANG Chengwu
XU Jinshuai
WANG Wei
MA Aiqing
WU Tian
SONG Xuan
PENG Yong
QIU Zhonghua
Related Institution
School of Electrical Engineering, Shanghai University of Electric Power
State Grid Sichuan Extra High Voltage Company
College of Electrical Engineering & New Energy, China Three Gorges University
Hubei Provincial Engineering Technology Research Center for Power Transmission Line, China Three Gorges University