In order to investigate the reasons of chromatogaram abnormal after the NO.2 transformer start working
comprehensive analysis was carried out by combining chromatogaram tracking with electric experiment data.The abnormal reason was caused by short circuit between iron core
and the defect of short circuit was treated.It is put forward that interstage insulated resistance between iron core should be measured during the period of the installation and inspection of transformer core
so as to prevent the fault caused by the short circuit of iron core interstage.