您当前的位置:
首页 >
文章列表页 >
USING SYNCHRONIZED-CLOSING DEVICE TO SOLVE THE SWITCHING OVERVOLTAGE PROBLEM OF A 500 kV POWER SYSTEM
更新时间:2025-04-26
    • USING SYNCHRONIZED-CLOSING DEVICE TO SOLVE THE SWITCHING OVERVOLTAGE PROBLEM OF A 500 kV POWER SYSTEM

    • High VoltageApparatus   Issue 5, Pages: 78-80(2003)
    • CLC: TM864
    • Published:2003

    移动端阅览

  • HE Shan-qing. USING SYNCHRONIZED-CLOSING DEVICE TO SOLVE THE SWITCHING OVERVOLTAGE PROBLEM OF A 500 kV POWER SYSTEM[J]. High voltageapparatus, 2003, (5): 78-80. DOI:

  •  
  •  

0

Views

149

下载量

47

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Investigation and Discussion on the Switch Tripping Accident of a 220 kV Substation
Phase Control Technology of Circuit Breaker with Application
Fault Classification Method of Circuit Breaker Based on Improved Phase Trajectory Features of Coil Currents
Analysis on Oil Cylinder Cracking of Energy Storage Mechanism for 500 kV Circuit Breaker
Influence of Difference of Three-phase Resistance of Closing Resistor of 750 kV Circuit Breaker on Overvoltage

Related Author

MAO Wen-qi
LI E-ying
LOU Dian-qiang
YAO Qi-xin
CHEN Yaqi
FAN Ruixiang
ZOU Yang
LONG Guohua

Related Institution

Hunan Electric Power Test and Research Institute
  湖南省电力试验研究院 湖南长沙410007  
State Gird Operation Company Limited Yichang Extra-high Voltage Administrative Company
Institute of Electric Power Science, State Grid Jiangxi Electric Power Co., Ltd.
School of Information Engineering, Nanchang Hangkong University
0