您当前的位置:
首页 >
文章列表页 >
OPERATIONAL TESTS OF GARABI Ⅱ HVDC THYRISTOR VALVES
更新时间:2025-04-26
    • OPERATIONAL TESTS OF GARABI Ⅱ HVDC THYRISTOR VALVES

    • High VoltageApparatus   Issue 1, Pages: 4-6(2003)
    • CLC: TN34
    • Published:2003

    移动端阅览

  • SHENG Bao-liang. OPERATIONAL TESTS OF GARABI Ⅱ HVDC THYRISTOR VALVES[J]. High voltageapparatus, 2003, (1): 4-6. DOI:

  •  
  •  

0

Views

94

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPERATIONAL TESTS OF THE THREE GORGES-CHANGZHOUHVDC THYRISTOR VALVES BY USING A SYNTHETIC TEST CIRCUIT
A NEW SYNTHETIC TEST CIRCUIT FOR THE OPERATIONAL TEST OF HVDC THYRISTOR MODULES
Study on a Synthetic Test Circuit of the Thyristor Valves
Analysis on Electromagnetic Interference of Short Circuit Current to Secondary Equipment and Research on Anti-interference Measures
Comparison of Several Synthetic Test Circuits for Ultra-high Voltage Circuit Breakers

Related Author

马为民
Pierre Riffon
Hans-Old Bjarme
盛宝良
D.Windmar
D.Windmar
H-O Bjarme
A.Blomberg

Related Institution

  北京100088  
  Canada  
  H2L 4P5  
  北京网联直流工程咨询公司 77180 Ludvika  
  Hydro Québec Montréal  
0