您当前的位置:
首页 >
文章列表页 >
IMPROVEM ENT ON THE DOM INANT INSULATION OF220kV CAPACITIVE BUSHING
更新时间:2025-04-26
    • IMPROVEM ENT ON THE DOM INANT INSULATION OF220kV CAPACITIVE BUSHING

    • High VoltageApparatus   Issue 5, Pages: 54-55(2002)
    • CLC: TM404
    • Published:2002

    移动端阅览

  • WU Yue, DAI Ping. IMPROVEM ENT ON THE DOM INANT INSULATION OF220kV CAPACITIVE BUSHING[J]. High voltageapparatus, 2002, (5): 54-55. DOI:

  •  
  •  

0

Views

105

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Fault Analysis and Improvement Measures of Smart GIS
Study on Influence of Micron-level Metal Dust on the Insulation Condition of GIS
Research on Application of Microphone-optimized Spiral Arrays-based Acoustic Imaging Devices in Partial Discharge Localization
Study on Fiber Interferometric Partial Discharge Ultrasonic Sensing Method Based on Acoustic-optic Modulation and RF Phase Detection
High-frequency Sensing Technology of Partial Discharge of Switchgear Cabinet for Wind Solar & Energy Storage Stations in Gobi Deserts

Related Author

NIU Bo
XIANG Zhonghua
MA Feiyue
MA Wenchang
WU Hong
NI Hui
NIU Bo
SUN Shangpeng

Related Institution

Power Research Institute of State Grid Ningxia Electric Power Co.,Ltd.
State Grid Ningxia Electric Power Co.,Ltd.
Maintenance Company of State Grid Ningxia Electric Power Co.,Ltd.
Power Research Institute of State Grid Ningxia Power Co
Electric Power Research Institute of State Grid Tibet Company
0