您当前的位置:
首页 >
文章列表页 >
SITUATION AND DEVELOPMENT OF ON-SITE TESTS FOR GAS INSULATED SUBSTATION
更新时间:2025-04-26
    • SITUATION AND DEVELOPMENT OF ON-SITE TESTS FOR GAS INSULATED SUBSTATION

    • High VoltageApparatus   Issue 4, Pages: 42-45(2001)
    • CLC: TM855
    • Published:2001

    移动端阅览

  • SHI Zhi-xia. SITUATION AND DEVELOPMENT OF ON-SITE TESTS FOR GAS INSULATED SUBSTATION[J]. High voltageapparatus, 2001, (4): 42-45. DOI:

  •  
  •  

0

Views

142

下载量

31

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

FEATURE OF NEW STANDARD IEC 60270 FOR PARTIAL DISCHARGE MEASUREMENT AND ITS INFLUENCE ON PD MEASURING ACTIVITY
Analysis of Gas Insulated Switchgear Test Methods on Site
On-site Examination on Neutral-point Insulation of Large Transformer
Interference Suppression in Partial Discharge Experiments of Current Transformer

Related Author

SHI Zhixia
SHI Hai-jun
WANG Guang-qian
ZHANG Shao-yan
WANG Wei1
LIANG Gui-shu1
HAN Jin-hua2
YANG Xiao-hui2

Related Institution

Changshu Power Supply Company of Jiangsu,Changshu
  江苏省常熟市供电公司 江苏常熟215500  
North China Electric Power University
Departent of High Voltage,Henan Electric Power Research Institute
Department of Electrical Engineering,Shanghai Jiaotong University
0