您当前的位置:
首页 >
文章列表页 >
Analylsis about Rejecting Remote Accident of 550 kV HGIS Disconnecting Switch
更新时间:2025-04-26
    • Analylsis about Rejecting Remote Accident of 550 kV HGIS Disconnecting Switch

    • High VoltageApparatus   Vol. 46, Issue 1, Pages: 58-60(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.01.018    

      CLC: TM564.1
    • Published:2010

    移动端阅览

  • DUAN Jian1, HE Zi-dong1, HUO Feng-ming2, et al. Analylsis about Rejecting Remote Accident of 550 kV HGIS Disconnecting Switch[J]. High voltageapparatus, 2010, 46(1): 58-60. DOI: 10.13296/j.1001-1609.hva.2010.01.018.

  •  
  •  

0

Views

124

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Exploring Fault of HGIS with Physical-chemical Analysis and Mechanical Performance Analysis
Analysis on a Short Accident of HGIS in Start Debugging Process of the 500 kV Power Transmission Project
Gas Chamber Flashover Failure Analysis of 550 kV HGIS
Study on the Feasibility of Removing the Opening and Closing Resistor of Disconnecting Switch in 750 kV GIS
Analysis and Treatment of a HGIS Partial Discharge Family Defect

Related Author

ZHONG Lisheng
REN Wen’e
YU Qinxue
YAN Nianping
HUANG Haikun
LIN Yihong
XU Jun
FU Zhiwei

Related Institution

Jiangxi Electric Power Research Institute
Electric Insulation Research Center,Xi’an Jiaotong University
Electric Power Science Research Institute of Fujian Electric Power Company Limited
Maintenance & Test Center of EHV Power Transmission Company
Economic Research Institute,State Grid Shaanxi Electric Power Company
0