Analysis on the Measured Recovery Voltage in Artificial Single-Phase Grounding Test for UHV AC Pilot Project
更新时间:2025-04-26
    • Analysis on the Measured Recovery Voltage in Artificial Single-Phase Grounding Test for UHV AC Pilot Project

    • High VoltageApparatus   Vol. 46, Issue 2, Pages: 1-4(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.02.003    

      CLC: TM862
    • Published:2010

    移动端阅览

  • TIAN Qing. Analysis on the Measured Recovery Voltage in Artificial Single-Phase Grounding Test for UHV AC Pilot Project[J]. High voltageapparatus, 2010, 46(2): 1-4. DOI: 10.13296/j.1001-1609.hva.2010.02.003.

  •  
  •  

0

Views

147

下载量

15

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental Study on VFTO Suppression Performance of Magnetic Ring Damping Bus for UHV GIS
Research Review on Tri-post Insulator for EHV/UHV GIL
Recovery Voltage Calculation following Current Interruption in Threephase Symmetrical Network.
Over-voltage of Series Compensated EHV Transmission Lines
DISCUSSION ON BREAKING TEST OF SELF-ENERGY ARC-EXTINGUISHING CHAMBER OF GCB

Related Author

MU Shuanglu
WANG Hao
LIU Weidong
LI Zhibing
LI Xinyi
GU Qun
YANG Xilong
CHEN Jing

Related Institution

Xi'an Xidian Switch Electric Co., Ltd.
China Electric Power Research Institute Co., Ltd.
Tsinghua University
Qujing Bureau of EHV Cornpany of China Southern Power Grid Corporation
College of Electrical and Electronics Engineering, Huazhong University of Science and Technology