您当前的位置:
首页 >
文章列表页 >
Analysis of a Breakdown Failure of Prefabricated 220 kV Cable Joint
更新时间:2025-04-26
    • Analysis of a Breakdown Failure of Prefabricated 220 kV Cable Joint

    • High VoltageApparatus   Vol. 46, Issue 5, Pages: 95-97(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.05.004    

      CLC: TM755
    • Published:2010

    移动端阅览

  • WU Ming-xiang1, BAO Jian-qiang2, WANG Jian-ming3, et al. Analysis of a Breakdown Failure of Prefabricated 220 kV Cable Joint[J]. High voltageapparatus, 2010, 46(5): 95-97. DOI: 10.13296/j.1001-1609.hva.2010.05.004.

  •  
  •  

0

Views

278

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of Circuit Breaker Failures Due to Lightning Strike in a 220 kV Substation

Related Author

MAO Wen-qi
HU Xu
DENG Ji
LI Zhi-yu

Related Institution

Hunan Electric Power Test and Research Institute
0