您当前的位置:
首页 >
文章列表页 >
The Reliability Verification of the Insulation Pull Rod in Circuit Breaker
更新时间:2025-04-26
    • The Reliability Verification of the Insulation Pull Rod in Circuit Breaker

    • High VoltageApparatus   Vol. 46, Issue 8, Pages: 63-65(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.08.004    

      CLC: TM561
    • Published:2010

    移动端阅览

  • DANG Xiang-dong. The Reliability Verification of the Insulation Pull Rod in Circuit Breaker[J]. High voltageapparatus, 2010, 46(8): 63-65. DOI: 10.13296/j.1001-1609.hva.2010.08.004.

  •  
  •  

0

Views

288

下载量

15

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on the Reliability Design of Transmission Shaft for GCB/GIS
Dynamics Simulation Analysis and Experimental Study of Circuit-breaker’s Insulation Pull Rod
Calculation of Characteristic Parameters of Ceramic Resistor with the Fitting Method

Related Author

LIU Jing-bo1
WU Sheng-bin1
CHENG Yong1
WEI Yong1
CHEN Zhi-bin1
ZHANG Wen-bing1
Lu Li2
ZHANG Hong-jun

Related Institution

Xi’an High Voltage Apparatus Research Institute Co.,Ltd.
Xi’an XD Switchgear Electric Co.,Ltd.
Beijing Beikai Electric Co.,Ltd.
0