您当前的位置:
首页 >
文章列表页 >
A New Field Test Method of 220kV CVT without Removing the HV Lead Conductor
更新时间:2025-04-26
    • A New Field Test Method of 220kV CVT without Removing the HV Lead Conductor

    • High VoltageApparatus   Vol. 46, Issue 8, Pages: 72-75(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.08.007    

      CLC: TM451.2
    • Published:2010

    移动端阅览

  • ZUO Wen-qi, GE Guang-yong, YE Hong-bo. A New Field Test Method of 220kV CVT without Removing the HV Lead Conductor[J]. High voltageapparatus, 2010, 46(8): 72-75. DOI: 10.13296/j.1001-1609.hva.2010.08.007.

  •  
  •  

0

Views

98

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF NEW TECHNOLOGY TO CONDITION-BASED MAINTENANCE OF ELECTRIC EQUIPMENT
Analysis of Common Faults of Type GW4-126 Disconnector and Its Improvement
Present Situation and Analysis of 500 kV CVT Operating in Eastern China Electric Power System
Analysis and Calculation of the Capacitance Inaccuracy in the Test of 220 kV CVT without Disconnecting Wire
Analysis of CVT’s Oil Tank Overheating Faults

Related Author

ZHU Yu-bi
WANG Guang-lin
CHEN Hong-wei
LI Chang-yi 2
HUANG Jian-hua 1
WAN Si-wei
LI Shun-yao
尹奎龙

Related Institution

Pingwei Electric Power Co.,Ltd.
  河南漯河电业局 河南漯河462001  
He’nan Luohe Electric Power Bureau
  江苏南京210029  
Jiangsu Ele ctric Power Research Institute
0