您当前的位置:
首页 >
文章列表页 >
Analysis of a Hydro-electric Station Grounding Device Problems and Rebuilding Measures
更新时间:2025-04-26
    • Analysis of a Hydro-electric Station Grounding Device Problems and Rebuilding Measures

    • High VoltageApparatus   Vol. 46, Issue 9, Pages: 99-102(2010)
    • DOI:10.13296/j.1001-1609.hva.2010.09.025    

      CLC: TV737
    • Published:2010

    移动端阅览

  • CAO Bin1, PEHG Yong2, YANG De-lun1, et al. Analysis of a Hydro-electric Station Grounding Device Problems and Rebuilding Measures[J]. High voltageapparatus, 2010, 46(9): 99-102. DOI: 10.13296/j.1001-1609.hva.2010.09.025.

  •  
  •  

0

Views

121

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Defining the Values of Related Parameters about Grounding Project
STUDY OF INFLUENCE FACTORS ON GROUNDING RESISTANCE
ANALYSIS ON SEASONAL COEFFICIENTS OF GROUNDING SYSTEMS FOR POWER PLANTS AND SUBSTATIONS
APPLICATION OF MOA ON LIGHTNING STROKE PROTECTION OF TRANSMISSION LINES
Influence of Neighboring Underground Metal Object on Measurement of Substation Grounding Resistance

Related Author

LI Jing-lu 1
ZHENG Rui-chen 2
YANG Ting-fang 1
LI Zhi-qiang 3
LIU Chun
LIU Xun
HE Jun-jia
GAO Yan-qing

Related Institution

  广东韶关512000  
  河南南阳473000  
Shaoguan Electric Power Company
Nanyang Electric Power Bureau
Changsha University of Science and Technology
0