The protection misoperation of 1 000 kV No.1 transformer in Jingmen Station was studied in this paper when transformer is charged during the system debug of UHV Pilot Project.The principle of second harmonic current restrained and wave symmetry restrained for regulating transformer differential protection was given according to the inrush current characteristic of regulating transformer.The reasons of the misoperation in SGT756 protection equipment and RCS978C protection equipment were analyzed separately.Three corresponding methods
changing the method of direct resistance test method
adding the erasing magnetism test and improving the protection principle
were put forward by the equipments operation situation in Jingmen station.When these methods were utilized in future China UHV project
the transformer protection reliability can be revised.