Design of an On-line Monitoring IED of Dielectric Loss in Capacitive Equipment in Intelligent Substation
更新时间:2025-04-26
    • Design of an On-line Monitoring IED of Dielectric Loss in Capacitive Equipment in Intelligent Substation

    • High VoltageApparatus   Vol. 48, Issue 1, Pages: 1-6+16(2012)
    • DOI:10.13296/j.1001-1609.hva.2012.01.004    

      CLC: TM762
    • Published:2012

    移动端阅览

  • WANG Hong-liang, HUANG Xin-bo, WANG Hong, et al. Design of an On-line Monitoring IED of Dielectric Loss in Capacitive Equipment in Intelligent Substation[J]. High voltageapparatus, 2012, 48(1): 1-6+16. DOI: 10.13296/j.1001-1609.hva.2012.01.004.

  •  
  •  

0

Views

408

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Synthesis Compareison Method Applied in On-line System for Capacitive Equipment
Insulation Defect Monitoring of Wide Area Capacitive Equipment Based on Synchronous Timing
Synchronization Test Technology for Line Merging Units Based on Voltage Following
Research Status and Development Trend of Distribution Cable Test Methods
Application of Zero Checking Method in the Digital tgδ Measuring

Related Author

WANG Xiao-ming1
LI Jun-hao1
MU Lei1
WU Xiao-hui1
LI Yan-ming1
YANG Haitao
KE Yanguo
LING Song

Related Institution

School of Electrical Engineering,Xi’an Jiaotong University
Ultra High Voltage Troansmission Subcompany of Jiangxi Electric Power Corporation,Nangchang
  江西省电力公司超高压分公司  
  江西南昌330006  
State Grid Anhui Electric Power Co., Ltd.
0