WANG Sen1, NIU Bo1, XUE Jun2, et al. Study on 750kV GIS VFTO Measurement Technology[J]. High voltageapparatus, 2012, 48(1): 35-40. DOI: 10.13296/j.1001-1609.hva.2012.01.010.
test method and field test result of three types(internal
external and transient shell ground potential) very fast transient over-voltage(VFTO) are introduced in this paper.At the process of internal VFTO testing of 750 kV GIS
the internal senor installed at the equipment is used as the primary sensor and high frequency coaxial sensor which independent developed is used as the secondary sensor.High voltage and high frequency TEK probe is used in the test system of transient shell ground potential.The above two types VFTO testing system are configured with long distance transmission testing system which include impedance transformer that has high frequency response
fiber transmission system and recording system.The principle and method of inverted fiber measuring is used in external VFTO testing system and the whole acquisition
transmission and recording system are also developed and configured.Aiming at field testing
anti-interference design is considered in all acquisition and testing system.By using the developed testing system
the three types VFTO of disconnector charged operation are measured in 750 kV Guan-ting substation.The waveform and data are analyzed and the result can provide important reference and guidance for disconnector normal charged operation in 750 kV and 1 000 kV GIS.