您当前的位置:
首页 >
文章列表页 >
Analysis of a 220kV Transformer Windings Breakage Fault Caused by Short-circuit
更新时间:2025-04-26
    • Analysis of a 220kV Transformer Windings Breakage Fault Caused by Short-circuit

    • High VoltageApparatus   Vol. 48, Issue 4, Pages: 115-118(2012)
    • DOI:10.13296/j.1001-1609.hva.2012.04.022    

      CLC: TM407
    • Published:2012

    移动端阅览

  • GAO Shu-guo1, ZHANG Yang2, CHEN Zhi-yong1, et al. Analysis of a 220kV Transformer Windings Breakage Fault Caused by Short-circuit[J]. High voltageapparatus, 2012, 48(4): 115-118. DOI: 10.13296/j.1001-1609.hva.2012.04.022.

  •  
  •  

0

Views

131

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Treatment and Analysis on Core Fault in Main Transformer
Prediction Model for Dissolved Gas in Transformer Oil Based on Policy Gradient Optimization
Research on Hybrid Finite Element Method Based on Triangle Mesh and Its Application in Fluid-heat Coupled Calculation of Transformer
Vibration Sound Power Measurement Method of UHV Transformer Based on Location of Main Vibration Point
Research on Multi-source Information Fusion Fault Diagnosis of Transformer Based on KPCA-SVM

Related Author

WANG Gang
SHEN Wei
MA Tao
TANG Jian
HOU Huijuan
WANG Shaojing
REN Maoxin
SHENG Gehao

Related Institution

Tangshan Power Supply Company
  唐山市供电公司检修公司 河北唐山063000  
Department of Electrical Engineering, Shanghai Jiao Tong University
State Grid Shanghai Electric Power Research Institute
Hebei Provincial Key Laboratory of Power Transmission Equipment Security Defense, North China Electric Power University
0