您当前的位置:
首页 >
文章列表页 >
Accident Analysis of Transformer Installation
更新时间:2025-04-26
    • Accident Analysis of Transformer Installation

    • High VoltageApparatus   Vol. 48, Issue 6, Pages: 119-122(2012)
    • DOI:10.13296/j.1001-1609.hva.2012.06.025    

      CLC: TM407
    • Published:2012

    移动端阅览

  • LIANG Fang-jian, LIU Xun, YANG Yan-qi. Accident Analysis of Transformer Installation[J]. High voltageapparatus, 2012, 48(6): 119-122. DOI: 10.13296/j.1001-1609.hva.2012.06.025.

  •  
  •  

0

Views

104

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Investigate to Bushing Failure on Medium Voltage Side of a 500 kV Transformer
Studies on Online Monitoring and Onsite Dielectric Loss Measurement of 500 kV Transformer Bushing
Prediction Model for Dissolved Gas in Transformer Oil Based on Policy Gradient Optimization
Research on Hybrid Finite Element Method Based on Triangle Mesh and Its Application in Fluid-heat Coupled Calculation of Transformer
Vibration Sound Power Measurement Method of UHV Transformer Based on Location of Main Vibration Point

Related Author

ZHANG Jian-xing1
ZHANG Jin-xiang1
WANG Jian-wei1
RU Fang-cong2
DONG Yuxi
XIE Deying
ZENG Li
XIE Bingping

Related Institution

North China Grid Company Limited Beijing Extra High Voltage Power Supply Co.
Langfang Power Supply Co.
Huizhou Electric Power Supply Bureau of Guangdong Power Grid Company Limited
Huiyang Ho Using and Urban and Rural Planning and Construction Bureau of Huizhou City
Department of Electrical Engineering, Shanghai Jiao Tong University
0