With the growth of capacity of high voltage direct current(HVDC) transmission lines
the ratings of thyristor valves
which are one of the most critical equipments
are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit
the later is an economical and feasible solution with less financial investment and higher test capability.However
the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project
just as in a direct test circuit.Equivalency analysis is focused in this paper
covering the scope of thyristor valves' steady state
and transient state.On the basis of the results achieved
a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi'an High Voltage Apparatus Research Institute Co.
Ltd.(XIHARI)
China.Some of the results have been adopted also by a new national standard of China.
With the growth of capacity of high voltage direct current(HVDC) transmission lines
the ratings of thyristor valves
which are one of the most critical equipments
are getting higher and higher.Verification of performance of thyristor valves particularly designed for HVDC project plays an important role in the handover of products between the manufacturer and the client.Conventional test facilities based on philosophy of direct test cannot meet the requirements for modern thyristor valves.New test facilities with high ratings are necessarily built based on philosophy of synthetic test.Over the conventional direct test circuit
the later is an economical and feasible solution with less financial investment and higher test capability.However
the equivalency between the synthetic test and the direct test should be analyzed technically in order to make sure that the condition of verification test in a synthetic test circuit should satisfy the actual operation condition of thyristor valves existing in a real HVDC project
just as in a direct test circuit.Equivalency analysis is focused in this paper
covering the scope of thyristor valves’ steady state
and transient state.On the basis of the results achieved
a synthetic test circuit of 6 500 A/50 kV for operational tests of thyristor valves used for up to UHVDC project has newly been set up and already put into service in Xi’an High Voltage Apparatus Research Institute Co.
Ltd.(XIHARI)
China.Some of the results have been adopted also by a new national standard of China.