Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test
更新时间:2025-04-26
    • Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test

    • High VoltageApparatus   Vol. 48, Issue 12, Pages: 98-104(2012)
    • DOI:10.13296/j.1001-1609.hva.2012.12.020    

      CLC: TM406
    • Published:2012

    移动端阅览

  • L Jing-shun1, ZHANG Hong-liang2, WANG Xuan2, et al. Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test[J]. High voltageapparatus, 2012, 48(12): 98-104. DOI: 10.13296/j.1001-1609.hva.2012.12.020.

  •  
  •  

0

Views

103

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of On-site Partial-discharge Test on 750 kV Transformers
Research on Oil Tank Seam Type Detection Method for Partial Discharge of Transformer
Generation of Non-Oscillating Steep Fronted Impulses for VFTO Tests of CIS
ANALYSIS AND TREATMENT FOR CORE INSULATION FAILURE IN POWER TRANSFORMER
THE PROGRAM DEVELOPMENT OF PD LOCATION SYSTEM USED IN LARGE-SIZE TRANSFORMER

Related Author

LI Yun-ge1
SHI Wei2
ZHANG Xiang-quan1
HAN Shao-zhou1
WANG Xuan3
WAN Rong-xing1
SONG Zhao-hui1
ZENG Xingyi

Related Institution

750 kV Lanzhou Operation Department of Power Transmission and Transformation,Northwest Grid Company
School of Electrical Engineering,Xi’an Jiaotong University
State Grid Fujian Wuyishan Power Supply Co., Ltd.
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
  西安交通大学  
0