L Jing-shun1, ZHANG Hong-liang2, WANG Xuan2, et al. Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test[J]. High voltageapparatus, 2012, 48(12): 98-104.
L Jing-shun1, ZHANG Hong-liang2, WANG Xuan2, et al. Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test[J]. High voltageapparatus, 2012, 48(12): 98-104. DOI: 10.13296/j.1001-1609.hva.2012.12.020.
Discussion on Preload Voltage Time in 750 kV Transformer Long-duration Induced AC Voltage Test
Compared with standards of 1 000 kV UHV transformer long-duration induced AC voltage test(ACLD)
early standards of 750 kV transformer long-duration induced AC voltage test are relative loose in the domestic.It is an effective method to solve this problem that adjusting the preload voltage time in long-duration induced voltage test.Based on weibull distribution method and the experiment data of basic insulation structures in UHV transformer
this paper calculates the expanded weibull distribution parameters for the partial discharge probability of basic insulation structures in a short period of time.Considering the level of 750 kV temporary overvoltage
preload voltage in 750 kV transformer ACLD are then studied with expanded weibull distribution.Finally
considering the factors of full test voltage
safety factor and controlled partial discharge probability
preload voltage time in 750 kV transformer ACLD are presented.