Very Fast Transient Overvoltage and Its Effects on Main Transformer of 500 kV GIS Substation
caused by disconnector operating in Fuqing nuclear power station 500 kV GIS substation
is presented by using Electro-magnetic Transient Program(EMTP)in this paper.Calculation and analysis
for the VFTO impact on the main transformer insulation
have been carried on.The results show that the long power cable connecting the GIS and the main transformer has caused the VFTO to have negligible effect on the main transformer.And pointed out that after installing generator circuit breaker(GCB)
the VFTO produced by main transformers operation can be eliminated effectively with reasonable operating way.