Key Technologies Research for the Installation and Field Test of ±800 kV Wall Bushing
The ±800 kV DC bushing is one of the most important equipment for the ±800 kV DC Transmission Project.The ±800 kV DC bushing used in the Yunnan-Guangdong Line ±800 kV DC Transmission Project is the first ±800 kV DC bushing in the world.This paper describes the dimension and inlet configuration of 800 kV bushing
the technical demands for the bushing and composite insulator are presented.The key technologies for field installation and test are given
and the flashover appeared in the DC withstander test and the insulation margin
environment;grading ring are discussed for this problem
and the improvement measure of insulation margin in the new project is also given
which is very helpful for the design and manufacture of ±800 kV DC bushing.