The China Southern Power Grid(CSG) has installed 6 sets of DC deicers on its backbone transmission grid since the ice disaster in 2008
among which the DC deicer in Gaopo substation of Gao-Zhao ±500 kV DC transmission lines is the first OPGW deicer in CSG.Most of the existing DC deicing researches concern the analyses of provincial power grid and transmission lines.However
the icing on overhead ground lines has become the secondary influencing factor in the causation of power system fault in winter.In this paper
the above 6 sets of DC deicers are described with emphasis on the OPGW deicer
and the deicing process and efficiency after the installation of deicing switches are analyzed.The feasibility and necessity of OPGW deicing is discussed
and suggestion of making a DC deicing process and installing deicing switches is offered to improve deicing efficiency.