您当前的位置:
首页 >
文章列表页 >
EMC Issues of IEDs Installed Locally
更新时间:2025-04-26
    • EMC Issues of IEDs Installed Locally

    • High VoltageApparatus   Vol. 49, Issue 7, Pages: 92-95(2013)
    • DOI:10.13296/j.1001-1609.hva.2013.07.002    

      CLC: TN03
    • Published:2013

    移动端阅览

  • LU Zheng-jun1, LI Chao-qun2, LI Yan3, et al. EMC Issues of IEDs Installed Locally[J]. High voltageapparatus, 2013, 49(7): 92-95. DOI: 10.13296/j.1001-1609.hva.2013.07.002.

  •  
  •  

0

Views

208

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation and Experimental Study on Partial Discharge Decomposition Components of Air-insulated Switchgear Cabinet Considering the Influence of Temperature and Humidity
Research on the Influence of Temperature and Humidity on the Physical Signal of Partial Discharge of Switchgear
RESEARCH ON THE CHARACTERISTICS OF ULTRASONIC SIGNALS OF PARTIAL DISCHARGE IN 12V SWITCHGEAR CABINET
STUDY OF THE HYBRID SURGE PROTECTIVE DEVICES
A Microcontroller-based Protection Unit for Switchgear of Terminal Users

Related Author

JI Hongquan
XIN Feng
LIU Ruoxi
WANG Zhihui
LUO Zhongge
GUI Yuan
CAI Lehui
ZENG Chaoxu

Related Institution

Power Research Institute of State Grid Beijing Electric Power Co., Ltd.
State Grid Beijingg Electric Power Company
State Grid Beijing Electric Power Company Urban Power Supply Company
Chengdu University of Technology
College of Electrical Engineering, Sichuan University
0