WEI Chang-yu 1, SUN Yong-heng 2, ZHANG Duo 2, et al. VFTO Computation of 1 100 kV HGIS in Nanyang Substation[J]. High voltageapparatus, 2013, 49(7): 35-39.
WEI Chang-yu 1, SUN Yong-heng 2, ZHANG Duo 2, et al. VFTO Computation of 1 100 kV HGIS in Nanyang Substation[J]. High voltageapparatus, 2013, 49(7): 35-39. DOI: 10.13296/j.1001-1609.hva.2013.07.010.
VFTO Computation of 1 100 kV HGIS in Nanyang Substation
VFTO computation is one of the main themes in order to realize reasonable insulation coordination and to construct strong ultra-high voltage electric grids.For 1 100 kV HGIS layout in Nanyang substation
the VFTOs caused by disconnector switching were computed
and the results show that the suppressed resistor is powerful to control VFTOs.The disconnector in Nanyang substation is equipped with 500 Ω resistor
under the severest closing condition
the peak of VFTO in GIS is 1 266.6 kV
which is much lower than its rated LIWV level 2 400 kV;the energy absorbed by suppressed resistor during a closing process is much lower than its rated thermal capacity
so the disconnector in Nanyang substation can be switched reliably.