您当前的位置:
首页 >
文章列表页 >
VFTO Computation of 1 100 kV HGIS in Nanyang Substation
更新时间:2025-04-26
    • VFTO Computation of 1 100 kV HGIS in Nanyang Substation

    • High VoltageApparatus   Vol. 49, Issue 7, Pages: 35-39(2013)
    • DOI:10.13296/j.1001-1609.hva.2013.07.010    

      CLC: TM564.1
    • Published:2013

    移动端阅览

  • WEI Chang-yu 1, SUN Yong-heng 2, ZHANG Duo 2, et al. VFTO Computation of 1 100 kV HGIS in Nanyang Substation[J]. High voltageapparatus, 2013, 49(7): 35-39. DOI: 10.13296/j.1001-1609.hva.2013.07.010.

  •  
  •  

0

Views

198

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on Suppression of Switching Overvoltage Caused by Operation of Disconnector in GIS
Design and Development of ZF8-550/4000-63 GIS
Simulation of Transient Enclosure Voltage in EHV GIS
Calculation of Very Fast Transient Overvoltage for 800 kV GIS Substation
Investigation on the High-frequency Model of SF6 Gas Discharge Caused by Disconnector Operation in GIS

Related Author

RUAN Quan-rong
SHI Wei
WANG Liang
ZHANG Meng
MA Zeng-rui
LIN Xin
LI Shuang
XU Jian-yuan

Related Institution

School of Electrical Engineering,Xi’an Jiaotong University
  西安交通大学电气工程学院 陕西西安710049  
Xi’an Shiky High Voltage Electric Co. Ltd.
  西安西开高压电气股份有限公司 陕西西安710077  
Shenyang University of Technology
0