Life Cycle Cost Estimation of Power Switchgears Based on Blind Number Theory
Life cycle cost(LCC) theory has been applied to many fields
and has brought in good social and economic benefits. The net present value method is often used in LCC analysis of conventional power switchgears
but the operation and maintenance costs of equipment as well as the failure cost usually account for a large proportion in the total cost. Because this proportion of cost will be spent in future and the actual operating condition of equipment is uncertain
the blind number theory can be adopted to deal with the uncertainty of the data of the switchgear. In this paper
the life cycle costs of the GIS and AIS options are analyzed based on the blind number theory. Combined with the time value of money
the LCC decomposition of the power switchgears and the computing model are discussed in detail. The LCC calculation results of two switchgears are analyzed and evaluated to determine that the optimal solution is GIS. The model possesses the capability of effectively dealing with a variety of uncertainties