您当前的位置:
首页 >
文章列表页 >
Overvoltage Calculation of Submarine Cable in VSC-HVDC Systems Based on MMC Average Value Model
更新时间:2025-04-26
    • Overvoltage Calculation of Submarine Cable in VSC-HVDC Systems Based on MMC Average Value Model

    • High VoltageApparatus   Vol. 50, Issue 2, Pages: 99-104(2014)
    • DOI:10.13296/j.1001-1609.hva.2014.02.018    

      CLC: TM721.1
    • Published:2014

    移动端阅览

  • ZHANG Zhengguo, ZHANG Jian, XUAN Yi, et al. Overvoltage Calculation of Submarine Cable in VSC-HVDC Systems Based on MMC Average Value Model[J]. High voltageapparatus, 2014, 50(2): 99-104. DOI: 10.13296/j.1001-1609.hva.2014.02.018.

  •  
  •  

0

Views

538

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Clamping Circuit Losses Calculation Method for MMC Submodule Based on IGCT
Time-varying Comprehensive Condition Assessment Model of Submarine Cable Considering Environmental Impact
Influence of Difference of Three-phase Resistance of Closing Resistor of 750 kV Circuit Breaker on Overvoltage
The Supression Methods of DC Side Harmonic Current and Resonance Overvoltage Adorpted in Zhou-shan DC System
On High-Voltage Engineering Course and Foreign Textbooks

Related Author

LOU Yantao
LIU Qi
XU Haibo
JI Yiming
ZHANG An'an
YUAN Haiyun
WANG Yanhong
LI Qian

Related Institution

Xi'an XD Power Systems Co., Ltd.
Department of Electrical Engineering, Tsinghua University
State Grid Economic and Technological Research Institute Co., Ltd.
School of Electrical Information, Southwest Petroleum University
CNOOC Research Institute Co., Ltd.
0