您当前的位置:
首页 >
文章列表页 >
Traceability and Uncertainties Assessment of Short-time Alternating Current RMS Measuring System in High Power Laboratories
更新时间:2025-04-26
    • Traceability and Uncertainties Assessment of Short-time Alternating Current RMS Measuring System in High Power Laboratories

    • High VoltageApparatus   Vol. 50, Issue 4, Pages: 72-76(2014)
    • DOI:10.13296/j.1001-1609.hva.2014.04.013    

      CLC: TM933.13
    • Published:2014

    移动端阅览

  • WANG An, YAN Duifeng, CUI Dong, et al. Traceability and Uncertainties Assessment of Short-time Alternating Current RMS Measuring System in High Power Laboratories[J]. High voltageapparatus, 2014, 50(4): 72-76. DOI: 10.13296/j.1001-1609.hva.2014.04.013.

  •  
  •  

0

Views

108

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

RESEARCH OF COMPUTER AIDED ANALYSIS SYSTEM IN HIGH POWER LAB
Computation Methods of Current Waveform Parameters in High Power Laboratory
Equivalency Analysis and Test Method of High Power Test for Ultra-high Voltage Circuit Breakers
Research on Calculation of Slope at Current Zero-crossing
Study of Connection Fitting Made of 12CrNi3 Based on Intensity

Related Author

?ZHU Xin juan 2
3
CAO Lin 1
ZHOU Hui-gao
WANG An
LI Yan-ming
MOU Lei
WANG Jing

Related Institution

Xi’an High Voltage Apparatus Research Institute
Northwesten Polytechnic University
Xi’an Jiaotong University
  陕西西安710049  
  陕西西安710072  
0