CHEN Leheng, YUAN Fengbiao, ZHANG Kairong, et al. Insulation Coordination Design of Roof High-voltage Equipments for High-speed Integrated Test Train[J]. High voltageapparatus, 2014, 50(7): 128-131.
insulation coordination analysis and improvement measures of the roof high-voltage equipments distribution of the 400 km/h high-speed integrated test train project
taken by Tangshan Railway Vehicle Co.
Ltd.
are described. Examination shows that the distribution scheme is reasonable and reliable
and meets the service requirement. This roof high-voltage equipments distribution scheme may provide a reference for other EMUs.