Development of a New Generation of Integrated Transformer Intelligent Components
A new integrated transformer intelligent components have been developed
in order to adapt to the rapid development of the intelligent primary equipment of the smart substation. The measuring IED
the air-cooled control IED
the on-load tap-changer control IED and the non-electricity protection IED are integrated into the intelligent comprehensive monitoring and control components of the transformer based on the feature functionality.The functions
such as intelligent non-electricity protection
air-cooled control and on-load tap-changer control are completed
and other functions as intelligent control
operation status monitoring and synthetic judgement of the transformer are carried out depending on the local operation of the transformer. The intelligent component will be used cooperated with the transformer in a new smart substation in Beijing after testing and experiments.