Analysis on a Short Accident of HGIS in Start Debugging Process of the 500 kV Power Transmission Project
更新时间:2025-04-26
    • Analysis on a Short Accident of HGIS in Start Debugging Process of the 500 kV Power Transmission Project

    • High VoltageApparatus   Vol. 50, Issue 9, Pages: 89-93+99(2014)
    • DOI:10.13296/j.1001-1609.hva.2014.09.016    

      CLC: TM711
    • Published:2014

    移动端阅览

  • FU Zhiwei, XU Jun, LIN Yihong, et al. Analysis on a Short Accident of HGIS in Start Debugging Process of the 500 kV Power Transmission Project[J]. High voltageapparatus, 2014, 50(9): 89-93+99. DOI: 10.13296/j.1001-1609.hva.2014.09.016.

  •  
  •  

0

Views

77

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Problems Appearing in Application of Optical Current Transformer in DC Conversion Station and Treatment
Analylsis about Rejecting Remote Accident of 550 kV HGIS Disconnecting Switch
Exploring Fault of HGIS with Physical-chemical Analysis and Mechanical Performance Analysis
Gas Chamber Flashover Failure Analysis of 550 kV HGIS
Analysis and Treatment of a HGIS Partial Discharge Family Defect

Related Author

CHENG Jiong2
ZHANG Yu-jiao1
LI Xiao-feng2
ZHEN Li3
HUO Feng-ming2
HE Zi-dong1
DUAN Jian1
ZHONG Lisheng

Related Institution

School of Electrical Engineering,Three Gorge University
Yichang Extra-HVDC Operation Administrator Company of State Grid Corporationt
  湖北宜昌443005  
Hebei Extra High Voltage Branch
Hebei Electric Power Research Institute
0