Analysis on a Short Accident of HGIS in Start Debugging Process of the 500 kV Power Transmission Project
A short trip accident of HGIS in start debugging process of the 500 kV power transmission project is discussed. Through analysis of the oscillograph trace of the fault
field investigation
and disassembly check of the faulty equipment
the cause of the trip is determined that the loose connection of the spline and the sleeve led to incomplete closing of an HGIS isolating switch
thereby breakdown took place in the loop-untying operation to result in the trip accident. The reason for the loose connection of spline and sleeve is analyzed experimentally. In addition
some technical measures are suggested to avoid similar accident.