    • Simulation of Secondary Arc Current and Recovery Voltage for 500 kV Transmission Line Based on PSCAD

    • High VoltageApparatus   Vol. 50, Issue 12, Pages: 71-78(2014)
    • DOI:10.13296/j.1001-1609.hva.2014.12.013    

      CLC: TM75
    • Published:2014

    移动端阅览

  • CAO Bin, WU Zhimin, ZHANG Peng, et al. Simulation of Secondary Arc Current and Recovery Voltage for 500 kV Transmission Line Based on PSCAD[J]. High voltageapparatus, 2014, 50(12): 71-78. DOI: 10.13296/j.1001-1609.hva.2014.12.013.

  •  
  •  

0

Views

639

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation and Analysis of Secondary Arc
Investigation to Power Frequency Overvoltages of Wubei-Tulufan-Hami 750kV Transmission System
Calculation and Analysis of Secondary Arc Parameters Based on Frequency Related Model
Study on Secondary Arc Current of Four-circuit on the Same Tower Lines of AC 1 000 kV and 500 kV/220 kV
Research on Secondary Arc Characteristics of UHV Lines With High Compensation Degree Series Compensation

Related Author

LIN Xin
HE Bai-na
XU Jian-yuan
LIU Qing~1
LI Shan~2
FAN Xu-hua~2
ZHANG Zeng-qiang~3
CHEN Wen-tao~2

Related Institution

Shenyang University of Technology
  沈阳工业大学 辽宁沈阳110023  
Xi’an University of Science and Technology
Electric Power Research Institute of Xinjiang, Wulumuqi
Electric Power Grid of Xinjiang,Wulumuqi
0