Overvoltage and Insulation Coordination for MMC-HVDC Asynchronous Project
Study on overvoltage and insulation coordination can provide basic technical support for the implementation of MMC-HVDC asynchronous project. The results are instructive to equipment in converter station for type selecting
designing
manufacturing and testing. Based on the back-to-back DC asynchronous interconnection project between Yunnan Power Grid and China Southern Power Grid
the insulation coordination scheme is proposed for its converter station
the combination of different system steady operation state
and the characteristic of asynchronous AC system are taken into consideration. The maximum stress on arrester and insulation levels of equipment in converter station are determined. The study results provide an important basis for engineering design.