您当前的位置:
首页 >
文章列表页 >
Engineering Practice of ±200 Mvar STATCOM in 500 kV Shuixiang Substation
更新时间:2025-04-26
    • Engineering Practice of ±200 Mvar STATCOM in 500 kV Shuixiang Substation

    • High VoltageApparatus   Vol. 51, Issue 6, Pages: 47-52(2015)
    • DOI:10.13296/j.1001-1609.hva.2015.06.009    

      CLC: TM761.12
    • Published:2015

    移动端阅览

  • MO Langjiao, LUO Shuquan. Engineering Practice of ±200 Mvar STATCOM in 500 kV Shuixiang Substation[J]. High voltageapparatus, 2015, 51(6): 47-52. DOI: 10.13296/j.1001-1609.hva.2015.06.009.

  •  
  •  

0

Views

86

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0