您当前的位置:
首页 >
文章列表页 >
Thyristor Valves in Jinping-Sunan±800 kV UHVDC Project
更新时间:2025-04-26
    • Thyristor Valves in Jinping-Sunan±800 kV UHVDC Project

    • High VoltageApparatus   Vol. 51, Issue 7, Pages: 42-45+51(2015)
    • DOI:10.13296/j.1001-1609.hva.2015.07.008    

      CLC: TM721.1
    • Published:2015

    移动端阅览

  • LOU Yantao, MA Yuanshe, LIU Fei, et al. Thyristor Valves in Jinping-Sunan±800 kV UHVDC Project[J]. High voltageapparatus, 2015, 51(7): 42-45+51. DOI: 10.13296/j.1001-1609.hva.2015.07.008.

  •  
  •  

0

Views

238

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Thermal Resistance Testing Method of Water-cooled Heatsink for UHVDC Thyristor Valve
Study on Total Electric Field and Assessment Technology of UHVDC Lines Based on Joint Distribution of Wind Speed and Direction
Seismic-reduction Control and Vulnerability Analysis of Ultra-high Voltage DC Wall Bushing
Electromagnetic Environmental Effect of ±800 kV UHVDC Transmission Lines
Simulation and Investigation on Switching Overvoltage at DC Side of UHVDC Converter Station with Capacity of ±800 kV

Related Author

GOU Ruifeng
LIU Ning
YANG Xiaoping
YAO Shu
LI Liang
QIN Ziyi
CHEN Jiong
REN Maoxin

Related Institution

East China Branch, State Grid Corporation of China
Shanghai University of Electric Power
State Key Laboratory of Disaster Reduction in Civil Engineering, Tongji University
China Electric Power Development Research Institute Co., Ltd.
College of Civil Engineering, Tongji University
0