您当前的位置:
首页 >
文章列表页 >
Research on HVDC Transmission Project Commutation Failure
更新时间:2025-04-26
    • Research on HVDC Transmission Project Commutation Failure

    • High VoltageApparatus   Vol. 51, Issue 7, Pages: 136-140+147(2015)
    • DOI:10.13296/j.1001-1609.hva.2015.07.027    

      CLC: TM721.1
    • Published:2015

    移动端阅览

  • CHEN Gan, TIAN Fang, LIU Ning, et al. Research on HVDC Transmission Project Commutation Failure[J]. High voltageapparatus, 2015, 51(7): 136-140+147. DOI: 10.13296/j.1001-1609.hva.2015.07.027.

  •  
  •  

0

Views

225

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Investigations on High-speed Actuator of Vacuum DC Circuit Breaker
Analysis of the Thyristor Trip Caused by Overhigh Junction Temperature
Analysis and Treatment of Partial Discharge Excess in 4 500 A Thyristor Valve
Study on AC Voltage Test Method of UHVDC Valve
Analysis on the Thyristor Valve Structure of ±500 kV Converter Station

Related Author

YUE Chang-xi
WANG Li-jun
ZHU Tian-sheng
JIA Shen-li
SHI Zong-qian
WANG Hui-yan
WANG Hui-yan
LI Xia

Related Institution

Department of Electrical Engineering,Xi′an Jiaotong University,Xi′an
Xi′an XD Power System Limited Company,Xi′an
Xi’an High Voltage Appararus Research Institute Co.,Ltd.
School of Electrical Engineering,Guizhou University
EHV Power Transmission Company of China Southern Power Grid
0