您当前的位置:
首页 >
文章列表页 >
Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC
更新时间:2025-04-26
    • Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC

    • High VoltageApparatus   Vol. 51, Issue 8, Pages: 80-85+91(2015)
    • DOI:10.13296/j.1001-1609.hva.2015.08.013    

      CLC: TM407;TM721.1
    • Published:2015

    移动端阅览

  • ZHU Yan, WANG Yuhong, LI Xingyuan, et al. Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC[J]. High voltageapparatus, 2015, 51(8): 80-85+91. DOI: 10.13296/j.1001-1609.hva.2015.08.013.

  •  
  •  

0

Views

191

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Multi-source Information Fusion Fault Diagnosis of Transformer Based on KPCA-SVM
Analysis of loop current and temperature rise of GIS shell of ±200kV converter station based on field-circuit coupling
Research on 24-pulse Rectifier Model Based on PSCAD/EMTDC
Simulation Study on Integration Siting of Large-scale PV Plant Considering Voltage Fluctuation in Distribution Network
Simulation of DC Traction Power Supply System Considering the Ferromagnetic Saturation Characteristic

Related Author

ZHOU Wen
CHENG Lin
LUO Chuanxian
ZHNAG Jing
JIANG Yi
YANG Xu
MAO Xintong
WU Wei

Related Institution

State Grid Xinjiang Electric Power Co., Ltd.
Wuhan NARI Co., Ltd.,State Grid Electric Power Research Institute
NARI Group Corporation (State Grid Electric Power Research Institute)
School of Electrical Engineering, Xi'an Jiaotong University
State Grid Jiangsu Electric Power Co., Ltd
0