ZHU Yan, WANG Yuhong, LI Xingyuan, et al. Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC[J]. High voltageapparatus, 2015, 51(8): 80-85+91.
ZHU Yan, WANG Yuhong, LI Xingyuan, et al. Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC[J]. High voltageapparatus, 2015, 51(8): 80-85+91. DOI: 10.13296/j.1001-1609.hva.2015.08.013.
Fault Simulation Analysis on Primary Devices of ±500 kV DC Transmission Project from Hulun Beier to Liaoning Based on PSCAD/EMTDC
To research the electrical characteristics of primary devices malfunction of ±500 k V DC Transmission Project from Hulun Beier to Liaoning for effectively identifying different faults
an equivalent model of the ±500 k V DC transmission system from Hulun Beier to Liaoning is established based on the electromagnetic transient simulation platform PSCAD/EMTDC. The primary devices of the transmission system are introduced in detail.Electromagnetic transient simulations are performed to investigate the faults of the primary devices at inverter side.Simulation results show that: 1)The fault of AC filter results in a tiny effect on the DC voltage and current at inverter side;2)When a fault happens in the converter transformer
the DC voltage and current at inverter side oscillates sustainedly
and the system loses stability; and 3)When a short-circuit fault occurs in the smoothing reactor
the DC current at inverter side fluctuates with many harmonic components
and the DC voltage at inverter side decreases slightly. Moreover
in the case of faults
the characteristic vectors of corresponding electrical quantities are extracted and analyzed based on the wavelet analysis to effectively identify various faults.