Logic Optimization of Switching in Bypass Pair at Rectifier Side by Islanding Approach for ± 800 kV Yunnan-Guangdong UHVDC Project
Yunnan-Guangdong UHVDC Project is the first ±800 kV UHVDC project in the world. The starting point of the project is the convertor station in Chuxiong
Yunnan Province
and the drop point is Suidong Convertor Station in Guangdong Province. The transmission capacity is bipolar 5 000 MW with±800 kV rated voltage. This project takes the configuration of double 12-pulse valve groups in series
each pole includes valve group 1 and valve group 2. In this paper
based on the commissioning islanding testing of ±800 kV Chu-Sui ultra-high voltage direct current system and the before-and-after comparisons of the logic optimization of switching in bypass pair by islanding approach through FTP system
the effectiveness of the logic optimization of switching in bypass pair at rectifier side is verified. The analysis reveals that the inhibition of switching in bypass pair at rectifier side by islanding approach avails to the system stability.