您当前的位置:
首页 >
文章列表页 >
Insulation Coordination Optimization Design for Low Voltage Ride Through Test Device of 35 kV Grid-connected Photovoltaic System
更新时间:2025-04-26
    • Insulation Coordination Optimization Design for Low Voltage Ride Through Test Device of 35 kV Grid-connected Photovoltaic System

    • High VoltageApparatus   Vol. 51, Issue 10, Pages: 8-12(2015)
    • DOI:10.13296/j.1001-1609.hva.2015.10.002    

      CLC: TM615
    • Published:2015

    移动端阅览

  • YANG Bo, WANG Deshun, ZHAO Shanglin, et al. Insulation Coordination Optimization Design for Low Voltage Ride Through Test Device of 35 kV Grid-connected Photovoltaic System[J]. High voltageapparatus, 2015, 51(10): 8-12. DOI: 10.13296/j.1001-1609.hva.2015.10.002.

  •  
  •  

0

Views

114

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Temperature Rise Calculation and Test of Large Capacity Dry-type Air-core Reactor Under AC and DC Superimposed Current
Effect of Mechanical DC Circuit Breaker Operation Timing Sequence on Operating Overvoltage in Flexible DC Distribution Network
Development and Project Application of Live Ice-melting System for UHVDC Transmission Lines
DESIGN AND RESEARCH OF INSTALLATION DIAMETER OF POST INSULATOR FOR DRY-TYPE AIR-CORE REACTOR
Principle and Analysis on Inter-turn Insulation Detection of Dry-type Air-core Reactor

Related Author

SUN Guohua
ZHANG Meng
XI Jingliang
LIU Chengzhu
XIA Zhihui
LIU Xuefeng
YANG Kun
QIAN Lihong

Related Institution

Beijing Power Equipment Group Co, Ltd
School of Electrical Engineering, Xi'an Jiaotong University
Zhuhai Power Supply Bureau, Guangdong Power Grid Corporation
State Grid Shaanxi Electric Power Co., Ltd.
Electric Power Research Institute of State Grid Shaanxi Electric Power Co., Ltd.
0