Robot Control Method of Live Working for Transmission Line Insulator Replacement
更新时间:2025-04-26
    • Robot Control Method of Live Working for Transmission Line Insulator Replacement

    • High VoltageApparatus   Vol. 52, Issue 10, Pages: 92-98+107(2016)
    • DOI:10.13296/j.1001-1609.hva.2016.10.016    

      CLC: TM84;TM755
    • Published:2016

    移动端阅览

  • ZOU Dehua, JIANG Wei, WU Gongping, et al. Robot Control Method of Live Working for Transmission Line Insulator Replacement[J]. High voltageapparatus, 2016, 52(10): 92-98+107. DOI: 10.13296/j.1001-1609.hva.2016.10.016.

  •  
  •  

0

Views

297

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DISCUSSION ABOUT THE STATISTIC CHARACTERISTICS OF CORONA CURRENT OF INSULATOR STRINGS
Insulation Protection Design of Live working Robot for 10 kV Distribution Power Systems
Study on Voltage-time Characteristic Coordination between Line Arrester and Insulator String
Representation Method of Insulator Pollution Degree Based on Leakage Current Fundamental Resistive Component
Simulation and Test of Potential Distribution for 750 kV Insulator String

Related Author

WEN Yuan-fang
LIU Chun
YIN Xiang-gen
NIE Yi-xiong
SU Jianju
SHI Xiangdong
LU Shou-yin
MA Chun-hua

Related Institution

  华中科技大学电气与电子工程学院 湖北武汉430074  
Huazhong University of Science and Technology
  山东 济宁 272400  
Shandong Jining Power Supply Company
Shandong Electric Power Research Institute
0