您当前的位置:
首页 >
文章列表页 >
Analysis on a Blocking Event and Restart of Jin-Su UHVDC Transmission Project
更新时间:2025-04-26
    • Analysis on a Blocking Event and Restart of Jin-Su UHVDC Transmission Project

    • High VoltageApparatus   Vol. 52, Issue 11, Pages: 51-56(2016)
    • DOI:10.13296/j.1001-1609.hva.2016.11.009    

      CLC: TM721.1
    • Published:2016

    移动端阅览

  • WEI Peng, LIU Jiankun, ZHOU Qian, et al. Analysis on a Blocking Event and Restart of Jin-Su UHVDC Transmission Project[J]. High voltageapparatus, 2016, 52(11): 51-56. DOI: 10.13296/j.1001-1609.hva.2016.11.009.

  •  
  •  

0

Views

203

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Modeling and Simulation of UHVDC Transmission System from Jinping to Sunan Based on the RTDS Simulation Platform of UHVDC Control and Protection
Research on Commutation Failure of Jin-Su DC Transmission Project Caused by a Complex AC Fault
Study on Total Electric Field and Assessment Technology of UHVDC Lines Based on Joint Distribution of Wind Speed and Direction
Seismic-reduction Control and Vulnerability Analysis of Ultra-high Voltage DC Wall Bushing
Development of UHV Flexible DC Control and Protection Equipment Based on Full Localization Chips

Related Author

ZHANG Qingwu
ZHANG Qingwu
QIN Ziyi
CHEN Jiong
REN Maoxin
YIN Fan
FANG Yuanqi
XIAO Liqun

Related Institution

NARI-Relays Electric Co.,Ltd.
NARI Relays Electric Co.,Ltd.
East China Branch, State Grid Corporation of China
Shanghai University of Electric Power
College of Civil Engineering, Tongji University
0