On-site Induced Overvoltage Withstand Test and Partial-discharge Test for 220 kV V/X Connection Traction Transformer
V/X connection traction transformers is mainly used in high-speed railway or passenger dedicated line currently. But on-site induced overvoltage withstand test and partial discharge(PD)test methods for such special transformers are rarely reported. Combined with national standards and power industry standard
this paper analyzes and discusses the standards
procedures
the methods of applied voltage and measurement of on-site PD test for handing over and taking over of 220 kV V/X connection traction transformers used in high-speed railway or passenger dedicated line
proposes the suggestions for on-site test of this kind of transformer
and calculates the parameters of the test. On-site tests for all the transformers of six traction substation are carried out. The results show that the test method is reasonable and feasible
and the testing process and results meet the requirements of the standard. On the other hand
this test method solves practical problems of on-site induced overvoltage withstand test and PD test of this kind transformer
which provides certain practical and reference for developing onsite PD test of this type transformer.