Electric Field Analysis and Shielding Optimization of 40.5 kV Wall Bushing
更新时间:2025-04-26
    • Electric Field Analysis and Shielding Optimization of 40.5 kV Wall Bushing

    • High VoltageApparatus   Vol. 53, Issue 1, Pages: 113-118(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.01.019    

      CLC: TM216.5
    • Published:2017

    移动端阅览

  • HAN Shaigen, CAO Bin, HUANG Qiang, et al. Electric Field Analysis and Shielding Optimization of 40.5 kV Wall Bushing[J]. High VoltageApparatus, 2017, 53(1): 113-118. DOI: 10.13296/j.1001-1609.hva.2017.01.019.

  •  
  •  

0

Views

244

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Electric Field Optimization and Structure Design of Wall Bushing in 40.5kV Air-insulated Switchgear
Research on Key Technologies of Installation and Use of 40.5 kV Switchgear Wall Bushing
Electric Field Simulation and Structure Optimization for Wall Bushing of KYN61-40.5 kV Switchgear
Study on Current Carrying Stability of ± 400 kV SF6 Gas Insulated Wall Bushing for DC Engineer Application
Typical Fault Analysis Caused by Shielded Separable Connector

Related Author

WANG Haiyan
ZHU Zhihao
FEI Xiang
ZHU Yanqing
YUAN Duanlei
LENG Zhaoyun
CHEN Ping
ZHANG Shuhao

Related Institution

Pinggao Group Co., Ltd.
State Grid Wuxi Power Supply Company
Xi’an XD Switchgear Electric Co.,Ltd.
College of Electrical Engineering and Automation,Fuzhou University
河南平高电气股份有限公司,河南平顶山 467001Henan Pinggao Electric Co., Ltd., Henan Pingdingshan 467001, China
0