您当前的位置:
首页 >
文章列表页 >
New Live Replacement Method of 110 kV Substation Disconnector and the Replacing Device Development
更新时间:2025-04-26
    • New Live Replacement Method of 110 kV Substation Disconnector and the Replacing Device Development

    • High VoltageApparatus   Vol. 53, Issue 2, Pages: 68-74(2017)
    • DOI:10.13296/j.1001-1609.hva.2017.02.011    

      CLC: TM564.1
    • Published:2017

    移动端阅览

  • XIAO Xiangqi, XIA Zengming, NIU Jie, et al. New Live Replacement Method of 110 kV Substation Disconnector and the Replacing Device Development[J]. High voltageapparatus, 2017, 53(2): 68-74. DOI: 10.13296/j.1001-1609.hva.2017.02.011.

  •  
  •  

0

Views

112

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of Finite Element Method in Electromagnetic Radiation Assessment Calculation of Prefabricated Substations
Research on Human Digital Twins for Live Working on Transmission Lines Based on Attitude Estimation
Analysis on Influence of Metal Particles in Different Positions on Electric Field of GIS Disconnector
Study on the Amplitude and Energy Characteristics of the in and out of Equipotential Pulse Current for 1000 kV Transmission Line Tension Tower Based on HHT
Live Working Insulation Blanket Surface Defect Recognition Based on Improved YOLOv8

Related Author

SHEN Yue
LIU Chuang
HAN Shanglin
FENG Jianqiang
MIAO Jiaqi
HUANG Jinliang
JIANG Nan
ZHANG Chengwu

Related Institution

Xi’an High Voltage Apparatus Research Institute Co, Ltd
School of Electrical Engineering, Shanghai University of Electric Power
New Northeast Electric Group High Voltage Switchgear Equipment Co, Ltd
State Grid Sichuan Extra High Voltage Company
College of Electrical Engineering & New Energy, China Three Gorges University
0